Create a clear orientation and labeling schedule for green wall mesh panels. Coordinate drawing views, panel identity and installation sequence before shipment.

Green wall mesh panels should arrive with an unambiguous panel identity, orientation and drawing reference. The label must distinguish the viewing side, top edge and intended position. A correct mesh panel installed in the wrong orientation can create avoidable fit and sequencing problems.

For contractors ordering green wall components, this is a logistics and drawing-control problem as much as a product selection problem. Establish the labeling convention before panels are manufactured or packed.

Define the drawing view first

State whether the elevation is viewed from outside the building, from the supporting structure or from another named direction. Avoid using left and right without that reference.

Jakob’s Webnet assembly instructions demonstrate the importance of a defined installation arrangement. Follow the instructions for the actual supplied system; do not assume every mesh product is installed in the same orientation or tensioned in the same sequence.

Use a label that answers five questions

Label fieldIllustrative entry
Panel identityGW-E-03
PositionEast elevation, bay 03
OrientationTOP arrow, exterior viewing side
DrawingGW-201 revision C
Pack referenceCrate 02, item 04

These entries are examples, not a required naming standard. A project may use a different convention, but it should remain consistent across the drawing, parts list and packing list.

For framed products, Webnet Frames technical information provides an external example of a system with defined dimensions and interfaces. General Webnet product information is useful background, not evidence that two panels can be interchanged.

Tubular Rail Cable Mesh Panel — Matte silver appearance - alternate view

Catalogue illustration: Tubular Rail Cable Mesh Panel — Matte silver appearance. Shown as a component reference, not an installation drawing or test result.

Do not infer orientation from overall size

Two panels can share the same width and height while differing in edge treatment, connection positions or other details. Identify them by the approved panel schedule rather than by size alone.

Review mesh seam connections and perimeter border options together. The orientation drawing should show which edge meets which adjacent panel and whether perimeter and intermediate connections differ.

A simple receiving exercise uses the packing list to select one panel, then traces its identity to the elevation and connection detail. Record any ambiguous labels before the whole shipment reaches site. This checks document usability; it is not a structural acceptance test.

Coordinate planting and access

The GreenSolutions technical catalogue provides context for cable-supported planting arrangements. The mesh installation plan should also respect the selected plants and maintenance access, which require their own project review.

GS1 traceability principles help separate a permanent product identity from a temporary installation label. Keep both where needed: the installer needs a location, while the asset manager may later need a batch reference.

Ferruled Cable Mesh Frame — Polished silver appearance - product reference

Catalogue illustration: Ferruled Cable Mesh Frame — Polished silver appearance. Shown as a component reference, not an installation drawing or test result.

Pack in the order the site will use

For an illustrative 12-panel elevation, packing all upper panels beneath all lower panels may create unnecessary handling if the agreed sequence needs the reverse. Obtain the installation sequence before finalizing the crate schedule.

Use the phased installation kit guide to align delivery lots with work areas. ISTA’s procedures provide a framework for transport protection discussions. Protect labels from moisture and abrasion without using attachments that could damage the finished component.

Do not allow the packaging plan to dictate an unsafe installation sequence. The responsible installation team should establish the method; purchasing should make the packing plan support it.

Keep labels out of the growing space

Temporary ties and packaging should be removed as instructed. RHS climber information provides plant-related context, but it does not replace the system designer’s requirements for panel loading and connections.

Record receiving checks and discrepancies against agreed criteria. Conformity assessment guidance helps distinguish a labeling inspection from broader product performance evidence.

Control drawing changes

If a panel position changes after packing, issue a revised schedule showing both the old and new identity where necessary. Do not rely on a handwritten arrow alone to communicate a mirrored layout. Keep removed labels or a photographic record until the revised mapping has been checked. The receiving team and installation team should work from the same revision, especially when delivery is split across several shipments.

Perimeter Tensioned Cable Net Panel — Fine brushed silver appearance - product reference

Catalogue illustration: Perimeter Tensioned Cable Net Panel — Fine brushed silver appearance. Shown as a component reference, not an installation drawing or test result.

Send the elevation, viewing convention, panel schedule and delivery sequence through OEM coordination. Review manufacturing capabilities, then request a labeled-kit quotation that identifies the records supplied with every crate. Clear labels turn an otherwise anonymous shipment into an installation-ready component schedule.