Use thread gauges that match the specified thread system, size, pitch, direction and tolerance requirements. Incoming inspection should follow a documented gauging method with identified equipment. A fitting that accepts one loose mating bolt has not necessarily passed the required thread inspection.
For quality teams receiving wire rope fittings, thread checks are an interface control. They do not establish cable holding strength, material grade or the load capacity of the assembled system.
Before opening the carton
Obtain the approved drawing and purchase specification. Confirm whether the thread is metric or inch, internal or external, and right- or left-hand. Our metric-versus-imperial thread guide helps distinguish the naming systems.
ASME B1.2 addresses gauges for Unified inch threads. The ASME B1 standards listing identifies separate references for other thread forms and gauging systems. Use the standard applicable to the ordered thread; do not transfer an acceptance rule from one thread family without checking its scope.
Prepare a small inspection card
| Field | Example of the information needed |
|---|---|
| Product identity | Fitting code, drawing revision and lot |
| Thread designation | Complete drawing callout |
| Gauge identity | Correct gauge type and asset number |
| Equipment status | Required calibration or verification record |
| Decision rule | Specified method and acceptance criteria |
| Result | Pass, fail or held for review |
Avoid publishing a universal number of turns for every NOT GO check. The governing procedure, gauge and thread type determine the acceptance method.
Catalogue illustration: Swage Stud Cable Terminal — WR096. Shown as a component reference, not an installation drawing or test result.
What a gauge can and cannot tell you
GO and NOT GO checks assess defined aspects of thread conformity under the applicable system. They are not a substitute for every dimensional or surface requirement. Inspect damage, incomplete machining and other specified features separately.
Bossard’s metric thread profile tool illustrates thread geometry, while its unit conversion tool helps with dimensional communication. Converting millimetres to inches does not turn a metric thread into an interchangeable inch thread.
Confirm direction using the left- and right-hand thread guide. A correctly manufactured left-hand component should not be rejected because someone selected a right-hand gauge.
Handle questionable results consistently
Clean and inspect the component and gauge as the procedure requires. Use the prescribed gauging technique; do not force a gauge through resistance to obtain a pass. Record whether the issue is contamination, visible damage or an unexplained gauging result.
For example, if one part fails while the rest of a sample passes, place the affected lot under the agreed review process. Do not silently discard the failed part and call the sample acceptable. The sampling plan should state the disposition rules before inspection begins.
Catalogue illustration: Eye To Eye Turnbuckle — WR032. Shown as a component reference, not an installation drawing or test result.
Keep equipment evidence meaningful
NIST’s traceability guidance explains the relationship between measurement results and their references. A sticker on a gauge is useful identification, but the inspection system should also retain the relevant records and address gauge condition.
Stainless threaded components may also suffer assembly damage. ASSDA’s galling guidance provides background; the thread galling prevention article connects this with cable fitting procurement. Passing incoming gauging does not mean the fitting cannot later be damaged by an unsuitable assembly method.
Agree the sampling plan with purchasing
NIST’s sampling-plan guidance explains why lot acceptance needs defined rules. Select a plan appropriate to the requirement and risk rather than automatically applying the same sample size to every order.
Use traceability principles to link the inspected sample to the received lot. Keep different thread sizes, directions and revisions separate throughout inspection and storage. A mixed carton can create field failures even when every individual part was manufactured correctly.
Avoid mixed gauge stations
Keep gauges for similar sizes and opposite thread directions clearly separated at the inspection station. Record the selected gauge before checking a lot, not retrospectively after a failure. If equipment status is unclear, hold the inspection decision and resolve that issue. A well-written acceptance plan cannot compensate for using the wrong gauge or one whose condition has not been established.
Catalogue illustration: Closed Body Cable Tensioner — WR011. Shown as a component reference, not an installation drawing or test result.
When asking for prices, state the drawing callout, inspection records and packaging identification required. Discuss nonstandard interfaces through OEM review, review manufacturing capabilities, and request a documented fitting quotation. This gives the supplier a measurable acceptance requirement instead of the vague instruction that threads should feel smooth.